[1]
2026. ANALISIS WAKTU PELAKSANAAN PEKERJAAN MENGGUNAKAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM) DAN BUILDING INFORMATION MODELLING (BIM). Jurnal Teknik SILITEK. 6, 02 (Apr. 2026), 338–346. DOI:https://doi.org/10.51135/ag979h53.