(1)
ANALISIS PERCEPATAN WAKTU DAN BIAYA (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG KANTOR PUSAT DAN KANTOR PUSAT OPERASIONAL ATAU BANK PASAR KABUPATEN DEMAK). JTS 2025, 5 (03), 1761-1769. https://doi.org/10.51135/27htb096.