ANALISIS PERCEPATAN WAKTU DAN BIAYA (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG KANTOR PUSAT DAN KANTOR PUSAT OPERASIONAL ATAU BANK PASAR KABUPATEN DEMAK). (2025). Jurnal Teknik SILITEK, 5(03), 1761-1769. https://doi.org/10.51135/27htb096