ANALISIS WAKTU PELAKSANAAN PEKERJAAN MENGGUNAKAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM) DAN BUILDING INFORMATION MODELLING (BIM). (2026). Jurnal Teknik SILITEK, 6(02), 338-346. https://doi.org/10.51135/ag979h53