“METODE PELAKSANAAN PEKERJAAN DIAPHRAGM WALL PADA PROYEK PEMBANGUNAN MRT JAKARTA FASE 2 PAKET CP 203” (2026) Jurnal Teknik SILITEK, 6(01), pp. 38–55. doi:10.51135/hwaftw76.