[1]
“ANALISIS PERCEPATAN WAKTU DAN BIAYA (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG KANTOR PUSAT DAN KANTOR PUSAT OPERASIONAL ATAU BANK PASAR KABUPATEN DEMAK)”, JTS, vol. 5, no. 03, pp. 1761–1769, Oct. 2025, doi: 10.51135/27htb096.